HxWork is Velaris's internal development board for tracking platform build work — designing case types, building integrations, authoring rules, and fixing bugs. Boards are scoped to Velaris artifacts (not customer cases), and stories move through a Backlog > In Design > In Development > In Review > Done lifecycle.
These are two separate modules for two separate purposes:
| HxWork | Work Center | |
|---|---|---|
| Who uses it | Platform developers, designers, admins | Case workers, managers, agents |
| What's tracked | Stories about building Velaris artifacts (case types, integrations, rules) | Customer-facing case instances |
| Lifecycle | Backlog > In Design > In Development > In Review > Done | Open > In Progress > On Hold > Resolved |
| Purpose | Platform development sprints and artifact lifecycle tracking | Day-to-day customer case work queue |
A Board is the top-level container in HxWork. Each board is scoped to a Velaris artifact — a case type, integration, rule set, or any platform component being developed. Create one board per major development effort (e.g. "KYC Case Type v2", "Stripe Connector Rebuild").
active (in use) or closed (completed/abandoned). Closed boards are read-only.Stories within a board move through five columns:
| Column | Meaning |
|---|---|
| Backlog | Identified but not yet started. Work to be scheduled into a sprint. |
| In Design | Requirements being defined, schemas being designed. No code yet. |
| In Development | Actively being built — frontend, backend, or both. |
| In Review | Change submitted for code/design review (often paired with an HxBranch review). Awaiting approval. |
| Done | Merged, tested, and confirmed complete. |
| Field | Description |
|---|---|
| Type | Epic / Feature / Story / Bug / Task |
| Priority | Critical / High / Medium / Low |
| Story Points | Effort estimate used in sprint velocity tracking |
| Assignee | User responsible for the work |
| Artifact Link | The Velaris artifact this story is about (case_type, integration, rule, form, or module) |
| Acceptance Criteria | Definition of done — conditions that must be true before marking Done |
Stories are assigned to sprints to time-box delivery. Create a sprint, assign stories from the backlog, start it, and close it when done. Incomplete stories automatically return to the backlog when a sprint closes. Sprint velocity (story points completed) is tracked per sprint for trend analysis.
| Method | Path | Description |
|---|---|---|
GET | /api/v1/hxwork/boards | List all boards |
POST | /api/v1/hxwork/boards | Create a board |
GET | /api/v1/hxwork/sprints | List sprints (filter by board) |
POST | /api/v1/hxwork/sprints | Create a sprint |
GET | /api/v1/hxwork/stories | List stories (filter by board, sprint, status) |
POST | /api/v1/hxwork/stories | Create a story |
PATCH | /api/v1/hxwork/stories/{id}/status | Move story to a new column |
GET | /api/v1/hxwork/activity | Activity feed (recent story changes) |